GLOBAL G.A.P. System: Module 3: Complete Ready-to-Use Documentation Templates Package
488603GLOBAL G.A.P. System: Module 3: Complete Ready-to-Use Documentation Templates Package 488603 778.99$
List of Documents of the Integrated Management System
List of Documents of the Integrated Management System
GLOBAL G.A.P. “Good Agricultural Practice System”
MORE THAN 90 DOCUMENTS (Procedures and Forms Included)
NBS-01 Manual of the Integrated GLOBAL G.A.P. System (Guide + 17 Forms):
GG-AF15.1/NBS-01/00 Organizational Structure
GG-AF 1.1.2/NBS-01/01 Field / Plot Registration Card
GG-AF 11.1/NBS-01/02 List of Products and Their GLOBAL G.A.P. Status
GG-AF 14.1/NBS-01/03 Monitoring of Certified / Non-Certified Product Sales
GG-AF 14.2/NBS-01/04 Accounting and Analysis of Produced, Stored and Purchased Products
GG-AF 14.3/NBS-01/05 Monitoring of Conversion Ratio (Raw Materials / Finished Products)
GG-AF 15.1/NBS-01/06 Food Safety Policy Declaration
GG-AF 16.2/NBS-01/07 Food Fraud Risk Mitigation Plan
GG-CB 2.1.1/NBS-01/08 List of Planting / Seed Material
GG-CB 2.1.3/NBS-01/09 Seed / Planting Material Quality Control Record
GG-CB 3.1/NBS-01/10 Soil Management Plan
GG-CB 3.1/NBS-01/11 Calculation of Crop Nutrient Requirements
GG-CB 3.2/NBS-01/12 Soil Maps of the Enterprise
GG-CB 3.4/NBS-01/13 Soil Quality Analysis Register (Laboratory Tests)
GG-CB 5.2.2/NBS-01/14 Water Use Plan and Water Efficiency Measures
GG-FV 2.1.1/NBS-01/15 Soil Fumigation (Gasification) Log
GG-AF.1/NBS-01/16 Production Flow Chart for Agricultural Products
GG-CB 7.1.1/NBS-01/17 List of Authorized Plant Protection Products
Orders:
Order on Development of the GLOBAL G.A.P. System
Order on Establishment of the Risk Management Team
Order on Implementation of the GLOBAL G.A.P. System
Procedures:
PR-01 Risk Assessment and Selection of Control Measures
PR-02 Document Management
PR-03 Internal Audit Procedure
PR-04 Occupational Hygiene
PR-05 Personnel Management (Training)
PR-06 Occupational Health and Safety
PR-07 Subcontractor Management
PR-08 Waste and Environmental Management
PR-09 Management of Nonconformities and Complaints
PR-10 Product Recall and Withdrawal
PR-11 Identification and Traceability
PR-12 Infrastructure and Equipment Management
PR-13 Integrated Pest Management
PR-14 Pre-Harvest and Post-Harvest Period, Product Handling
41
